Friday's attempt at taking an order: Does a customer without a PO number get closer to an order if the Place order stop keeps Alex's sentence as it is and adds Claude's clause after it, "No PO number yet? Write QUOTE in the PO number blank and hand it to purchasing."? The same printed Purchase request would then work as a quote request, and Bev says purchasing would price it. Nothing changes on screen except the stop, the order still takes nothing, and Chip builds only after Gary and Bev's ink result is posted in the thread.
#ordering-lab
Preparing Bellwether’s twelve-product list.
Sunday's attempt at taking an order: Does a customer without a PO number get closer to an order if Bev's paper version goes up: the printed Purchase request title reads "PO number or QUOTE: ____ Sent by: ____", so the sheet that reaches purchasing tells them what to write, and the Place order stop only has to point them to print instead of carrying a QUOTE sentence? Bev says a QUOTE sheet with a name in Sent by is one she could price, and one with no name goes in a drawer.
Monday's attempt at taking an order: Does a customer without a PO number get closer to an order if the printed Purchase request title reads "PO number or QUOTE: ____ Sent by: ____" and Place order shows one stop for everyone: "No order is placed from this page. Print this page, fill in the blanks on your Purchase request and hand it to purchasing."? Bev files any later sheet with the same number as a duplicate. Before anything is printed, Alex answers Jen on whether dropping the tick goes up with the title or comes after it.
Purchase request with PO number or QUOTE and sender blanksReviewed version on the cartTuesday's attempt at taking an order: Does a customer reordering from an approved sheet get closer to an order if Yes on "Ordering from an approved purchase request?" goes back to the held usual-list step, which starts from fixed suggested quantities to change to match the approved sheet, with every number given a written source and any unsourced number left blank, and then ends at the same Purchase request print (PO number or QUOTE, Sent by) and the Place order stop?
Wednesday's attempt at taking an order: Does the printed Purchase request route get closer to an order if the Place order stop tells customers what to do after a reset and reprint? Jen proposed "Print before you start over". Bev objected that "the last one you printed" leaves the customer to sort the same undated pile she can't sort, so the line under discussion is Claude's "Printed it twice?
Thursday's attempt at taking an order: Jen's route, with Claude's wording, puts a "Start the next request (clears your list)" control under the Place order stop, but the lab has no component that can sit after the final order step or empty the list, and nobody has posted which of the five reset controls actually empties Review your list (Alex's check), so the order still stops on paper and Place order still takes nothing.
Friday's attempt at taking an order: Does the printed Purchase request get closer to an order Bev can price if the title gets a third blank, "PO number or QUOTE / Sent by / Date", and the Place order stop tells customers to date the sheet, says a later-dated sheet with the same number replaces the earlier one (Bev's revision rule), and says to hand it to "Purchasing, attn: pricing"? This works whether or not Alex's still-owed sandbox runs find a reset control that empties Review your list.
Purchase request with PO number or QUOTE, sender and date blanksReviewed version on the cartThread
#ordering-lab15 replies
Gary, my vote is "Reset this step," if that's what it actually resets. I want to give you one name I can stand behind. The name isn't evidence that it clears the list.
Jen: Chip, Gary's right here and actually asking. Pick one name with him,...Earlier in the channel"This step" gives me something to check. But I want to reach the end without resetting anything. Could we try a checklist from choosing the items to handing over the request? I can count the rows on the printed sheet against the list. That belongs before the handover.
1 choice before that checklist: "Need a price, or already have an approved request?" I'd try the price route first. Choose quantities, check the sheet, write QUOTE, name and date, hand it to pricing. We can use the three blanks we already have.
Then for the price route I'd call the last button "Prepare quote request." Bev, back me on that? I can explain a sheet that goes to pricing. I'm tired of defending "Place order" with a sentence saying it doesn't.
Yes, Chip. Put "Nothing is sent from this page" beside it, before they press it. "Prepare" earns its keep if they know they're still the one carrying the paper.
jen, the fork needs checking both ways. an approved request mustn't come out the other end telling someone to write QUOTE over their number. i'll check both paths in the sandbox. the opening question can look right while the sheet is wrong.
That's the check I want, Alex. We're trying the price checklist today. Chip builds the opening choice and numbered instructions through quantities, print, comparison and handover, with "Prepare quote request" on the price route. Keep the approved-request route separate. Alex checks both paths before it goes up; Gary checks the printed items and quantities; Bev decides whether the sheet is enough to price.
Keep "Purchasing, attn: pricing" in the handover. I want that destination earning its keep instead of me walking sheets over. Even a checked quote request still needs handling on paper; this page sends nothing and cannot place the order.
attn: pricing stays, Jen, but nothing new went up for it to stay in. review held it before I built anything. we drew two endings, one per route, each with its own list, its own sheet and its own order step, and the cart only has room for one of each. so live is still this morning's: the three-blank print, Alex's stop, Place order taking nothing. and yeah, I named a button for an ending that was never going to fit 🧩
StandardProtected item listboth paths was my check and i never ran it. review got there first. fix: one ending. the fork only changes the numbered steps before the list, then both routes land on the same list, same sheet, same stop. the stop already says PO number or QUOTE, so it talks to both
1 button for both routes means "Prepare quote request" sits in front of someone holding an approved number. TBH I'd rather the label was wrong for nobody: "Prepare purchase request." QUOTE goes in the blank, not on the button.